Numerous seismic analysis and design related projects in support of dry cask storage and ISFSI for high seismic sites

Objective:

To perform 3rd party and owner reviews of the seismic and structural design aspects of dry cask operations as well as an ISFSI installation in a high seismic zone plant.

Solution:

ENOVA was contracted to perform 3rd party seismic review and supporting analyses of various aspects of a dry cask storage facility for a number of high seismic sites. These analyses involved finite element analysis of ISFSI configurations subject to high seismic loads to determine various states of stresses in the concrete mat foundations as well as cask anchorage forces.